Objectives
This WP includes all the demonstration activities in both Turin and Malmo pilot sites. This has as objective the installation of required components (gateways and smart meters) and the subsequent data collection. Another essential part of this WP will be the definition of metrics that will be used for final evaluation and the scenario where there will be evaluated. Also, this WP includes the development of a simulation engine that will help the analysis of the scalability of the FLEXMETER solution on a larger scale.
Deliverables
D6.2 – Report on evaluation scenario and metrics
D6.3 – Report on system deployment and data collection
D6.4 – Report on evaluation against defined metrics and scaling issues
Timing and role of partners
Months: 18-36
WP Leader: RWTH AACHEN
WP Participants: POLITO, IREN ENERGIA SPA, STMICROELECTRONICS SRL, INP GRENOBLE, UPB, SIVECO ROMANIA SA, E.ON SVERIGE