Objectives

This WP includes all the demonstration activities in both Turin and Malmo pilot sites. This has as objective the installation of required components (gateways and smart meters) and the subsequent data collection. Another essential part of this WP will be the definition of metrics that will be used for final evaluation and the scenario where there will be evaluated. Also, this WP includes the development of a simulation engine that will help the analysis of the scalability of the FLEXMETER solution on a larger scale.

 

Deliverables

D6.1 – Simulation engine

D6.2 – Report on evaluation scenario and metrics (submitted)

D6.3 – Report on system deployment and data collection

D6.4 – Report on evaluation against defined metrics and scaling issues

 

Timing and role of partners

Months: 18-36

WP Leader: RWTH AACHEN

aachen

WP Participants: POLITO, IREN ENERGIA SPA, STMICROELECTRONICS SRL, INP GRENOBLE, UPB, SIVECO ROMANIA SA, E.ON SVERIGE

politoirenstm inpg  upb  siveco eon