Objectives

In this WP we will provide specification from one side about the distribution and communication network in general, then we will specify the characteristics of the two demonstrators in Turin and Malmo. Also, the specification about the ICT platform requirements will be provided. The pilots will be described in details as well as the location of gateways and meters to be installed.

 

Deliverables

pdf_icon D1.1 – Report on specification of the distribution network

pdf_icon D1.2 – Report on energy aggregator communication network

pdf_icon D1.3 – Report on Platform requirements, data formats and protocols

pdf_icon D1.4 – Report on pilots description

 

Timing and role of partners

Months: 1-13

WP Leader: POLITO

polito

WP Participants: IREN ENERGIA SPA, STMICROELECTRONICS SRL, TELECOM ITALIA S.p.A, SIVECO ROMANIA SA, E.ON SVERIGE

iren stm ti siveco eon